Early spring, 2000.  Major components on site at the Front Royal Regional Airport.

   

Don Moyer, Jr finishes attaching the wing bolts prior to moving the fuselage into place, July 23, 2000.

 

Fuselage loaded onto truck, minor prep work done.

  

Fuselage lowered into place, attaching bolts installed.

  

Walt Moyer discovers how simple it is to lower the nose gear.  Just remove the screws dad installed to hold everything up inside!  Would you believe the tire still holds air?

Nose gear locked in place, finish tightening wing-attach bolts.