Home | CEC Overview | Feasibility Studies | Plant Services | Process
Engineering | Engineering Services | Project Services | Technology Development | Studies
Client Project Representative | Registration | Contact us | Useful Links | Engineering Search | Engineering Unit Conversions
| Previous Page | Next Page
New Projects:
Process Design and Optimization
Control System Philosophy and The Selection of Key Hardware
Selection of Key Design Features and Decision on the Key Parameters
Selection of Key Mechanical Equipment Packages
Project Codes, Standards and Criteria
Detailed Plan for Project Execution
Design Base Manuals
Bid Documents for Tendering EPC Contractor and Equipment Packages
Methanol & Ammonia Retrofit Projects:
CEC's experience base in methanol and ammonia plant design, engineering and operations enables the company to undertake
complex retrofit projects. The following is a typical list of these services:
Methanol and Ammonia Converter Upgrade
CO2 Recovery from Reformer Flue Gas
Pre-reforming of the Reformer Process Gas Feed
Incorporating Process Gas Saturator
Reformer Debottlenecking Studies and Recommendations
Debottlenecking Studies for Distillation and Recommendations
Debottlenecking Rotating Equipment and Peripherals
Plant Capacity Upgradation and Performance Testing
Plant Optimization Studies, Theoretical and Operational
S/C Ratio Optimization
Fugitive Methanol Emissions and Spillage from Distillation
Integration of a Turboexpander
Partial Oxidation Combined with a Purge Gas Turboexpander
Ultra Low NOx Burners for Reformers
Zero Liquid Effluent Discharge
Interlock Trip System Logic Review, Improvements and Hardware Assessment
Methanol Production from a New Reactor Installed on the Purge Stream
Procedures for Monitoring the Age of Plant Equipment
Reformer Remaining Tube Life Assessment
Assessment of Plant Operations, Operability and Reliability Studies
Catalyst Activity Evaluation and Recommendations.
Safety and Reliability Studies:
Safety-in-Design
RAM Analysis
PHA and HAZOP Studies
Operability Studies
Criticality Analysis
Kepner Tregoe Decision Analysis
HSE Reviews and Analysis Including Workplace Exposure Limits. Refer to EU exposure limits as typical
Plot Plan Reviews and Operability Studies
Early Project Deliverables:
Firewater Requirements and Firewater System Design
Pipeline Pressure Surge and Waterhammer Analysis
Drainage Requirements, Ponds, Tailings, Winterization, etc.